Happy Jack Wind Farm & Substation- Cheyenne, WY
Installation of Qty 14 - 35 kV transformers and basements
Installation of turbine to transformer cabling
Installation of ground grid and grounding system
23,000'of high voltage trench and installation of conductors, fiber cable, and grounding
High voltage splicing and terminations
Fiber terminations
Wiring of Qty 14 - 2.1 MW Suzlon turbines
Construction of 34.5 kV to 115 kV substation |
| |
|
Charles City Wind Farm - Charles City, IA
Installation of Qty 50 - 35 kV transformers
Installation of transformer basements
Installation of cabling from the turbines to the transformers
Installation of ground grid and grounding system
157,000' of high voltage trench and installation of conductors, fiber cable, and grounding
High voltage splicing and terminations
Fiber terminations at turbines and substation
Wiring of Qty 50 - 1.5 MW GE turbines |
| |
|
ConocoPhillips Energy Recovery Project
Installation of switchgear and transformer for new 1.5 MW steam turbine
Installation of raceway, cable, and supporting instrumentation
|
| |
|
Billings Baseball & Mulit-Use Stadium
|
| |
|
ConocoPhillips Low Sulfur Gas II Project
|
| |
|
ConocoPhillips MCC 7 C&D Replacement
Replacement of three existing switchgear lineups
Installation of 2000' of raceway
Installation of 120,000' of cable
Switch over of 69 live refinery loads
|
| |
|
Diamond Ridge Wind Farm - Baker, MT
Installation of Qty 13 - 35 kV transformers
Installation of transformer basements
Installation of cabling from the turbines to the transformers
Installation of ground grid and grounding system
11,400' of high voltage trench and installation of conductors, fiber cable, and grounding
High voltage splicing and terminations
Fiber terminations at turbines and substation
Installation of SCADA and Wind Farm Management systems
Wiring of Qty 13 - 1.5 MW GE turbines |
| |
|
Century III Wind Farm - Blairsburg, IA
Installation of Qty 10 - 35 kV transformers
Installation of transformer basements
Installation of cabling from the turbines to the transformers
Installation of ground grid and grounding system
15,000' of high voltage trench and installation of conductors, fiber cable, and grounding
High voltage splicing and terminations
Fiber terminations at turbines and substation
Wiring of Qty 10 - 1.5 MW GE turbines |
| |
|
Cenex Harvest States Naptha Hydro Treater Upgrade
Installation of new process control instrumentation and integration with existing DCS system on an operating unit
Power feeds for new 5 kV compressors and associated equipment
Installation of 25,000' of rigid conduit
Installation and termination of 175,000' of wire and cable
|
| |
|
Cenex Harvest States Cat Feed Hydrotreater Project
Power feeds for new compressor and associated equipment.
Installation of new process control instrumentation and lighting.
Installation of 11,000' of rigid conduit.
Installation and termination of 60,000' of wire and cable.
|
| |
|
Billings, Montana Water Treatment Plant Expansion
Demo existing Filter Building and construct a new Filter Building with 8 new Filters.
Install 1000’ of Concrete Encased Underground Ductbank
Installation of 600 KW Generator with ATS.
New fiber optic network.
Installation of 11 new PLCs, associated instruments, HMI Programming, Operator Workstations, and UPS System. |
| |
|
Spearville Wind Farm – Spearville, KS
Installation of Qty 67 - 35KV transformers
Installation of concrete transformer pads
Installation of cabling from the controllers to the transformers
Installation of ground grid and grounding system
Supervision of High Voltage Trenching and Cable Laying
High Voltage Splicing and Terminations
Wiring of Qty 67 - 1.5 MW GE Turbines |
| |
|
Judith Gap Wind Farm – Judith Gap, MT
Installation of Qty 90 - 35KV transformers
Installation of concrete transformer pads
Installation of cabling from the controllers to the transformers
Installation of ground grid and grounding system
Substation Control Wiring
High Voltage Splicing, Cross-Bonding, and Terminations
Wiring of Qty 90 - 1.5 MW GE Turbines |
| |
|
Spring Canyon Wind Farm – Peetz, CO
Installation of Qty 40 - 35KV transformers
Installation of concrete transformer pads
Installation of cabling from the controllers to the transformers
Installation of ground grid and grounding system
High Voltage Splicing, Cross-Bonding, and Terminations
Wiring of Qty 40 - 1.5 MW GE Turbines |
| |
|
Billings, Montana Waste Water Treatment Plant
Construction of New Headworks Facility
Removal of PCB contaminated HV Transformer
Installation of 1000’ of Concrete Encased Underground Ductbank
Extension of existing fiber optic network.
Class 1 Division 1 Electrical Installations
Instrumentation work including installation of new PLCs, Flow Meters, Level Transmitters, Pressure Indicators, Device Net Equipment, HMI Programming and Operator Workstations. |
| |
|
ConocoPhillips Low Sulfur Diesel Project
Installation of new 5KV switchgear
Installation of new 480v switchgear
Installation of new 85,000 pd substation
Installation of 2000’ of ladder cable tray system
Installation and termination of 5KV cables
Installation of complex fiber optic network
Installation and connection of explosion proof light fixtures, devices and instruments
Installation of new 4000’ heat trace system |
| |
|
Cenex Harvest States Coker Ductbank
Excavation and installation of 2300' of concrete encased underground electrical ductbank, including 35,0000' of electrical conduit.
Installation of underground concrete electrical vaults
Installation of Trenwa underground electrical trench |
| |
|
ConocoPhillips Tanks Gauging, Phase V
Installation of field bus to 31 tanks
Installation of radar gauges on 9 tanks
Installation of 13,000' of rigid conduit
Pull and terminate 40,000' of cable
Work performed in "fresh air" gear on tank structures |
| |
|
ConocoPhillips FCC Project
Installation of new third and fourth stage separator
Installation of new classified lighting panels and fixtures on new structures
Installation of instrumentation system
|
| |
|
Absoloka Mine Dragline Relighting
Installation of new lighting package
|
| |
|
Cenex Harvest States Merox/Olefin Splitter
Installation of process control and monitoring instruments.
Installation of 6000' of rigid conduit
Installation and termination of 25,000' of wire and cable
|
| |
|
Gillette, WY Waste Water Treatment Plant
New Aeration Basins, Dewatering Unit, and Chlorine Unit.
Remodel of Grit Unit, Blower Unit, Digester Unit, and Influent Unit.
Installation of 6000' of concrete encased underground ductbank.
Class 1, Division 1 installations.
New fiber optic network.
Installation of 8 new PLCs, associated instrumentation, HMI programming, and operator work stations.
|
| |
|
Northern Winz Casino
Installation of electrical systems for 28,000 sq-ft casino located on the Rocky Boy Indian Reservation.
|
| |
|
ExxonMobil Little Texas Construction Facility
Installation of 4000 ft of electrical duct bank
Installation of new 5kV transformer and related equipment
Installation of new communications network
Installation of grounding system
|
| |
|
Glacier Wind Farm Phase I & II - Ethridge, MT
Installation of Qty 140 - 35 kV transformers and basements
Installation of turbine to transformer cabling
Installation of ground grid and grounding system
High voltage splicing and terminations
Fiber terminations
Wiring of Qty 140 - 1.5 MW Acciona turbines |
| |
|