Hawthorne Bridger Facility
Install new 4160V 1250hp Booster Motor/Pump/VFD
Install new MCC Building
Install all related conduit, cabling and grounding
Install and terminate at PLC controller |
| |
|
Overland Pass Pipeline Project - Southern WY/Northern CO
Installation of power, lighting, HVAC, communications,and instrumentation for twelve pipeline pump station monitoring sites
|
| |
|
ExxonMobil Flare Gas Recovery Project - 2010
Install raceway, cable tray and cabling
Install associated instrumentation
Complete grounding system
Installed lighting
|
| |
|
ExxonMobil Eductor Project - 2009
Install raceway, cable tray and cabling
Install associated instrumentation
Complete grounding system
Installed lighting
|
| |
|
ConocoPhillips Energy Recovery Project
Installation of switchgear and transformer for new 1.5 MW steam turbine
Installation of raceway, cable, and supporting instrumentation
|
| |
|
ConocoPhillips Low Sulfur Gas II Project
Install raceway, cable tray and cabling
Install associated instrumentation
Complete grounding system
Installed lighting
|
| |
|
ConocoPhillips MCC 7 C&D Replacement
Replacement of three existing switchgear lineups
Installation of 10,000' of raceway
Installation of 120,000' of cable
Switch over of 69 live refinery loads
|
| |
|
Cenex Harvest States Naptha Hydro Treater Upgrade
Installation of new process control instrumentation and integration with existing DCS system on an operating unit
Power feeds for new 5 kV compressors and associated equipment
Installation of 25,000' of rigid conduit
Installation and termination of 175,000' of wire and cable
|
| |
|
Cenex Harvest States Cat Feed Hydrotreater Project
Power feeds for new compressor and associated equipment.
Installation of new process control instrumentation and lighting.
Installation of 11,000' of rigid conduit.
Installation and termination of 60,000' of wire and cable.
|
| |
|
ConocoPhillips Low Sulfur Diesel Project
Installation of new 5KV switchgear
Installation of new 480v switchgear
Installation of new 85,000 pd substation
Installation of 2000’ of ladder cable tray system
Installation and termination of 5KV cables
Installation of complex fiber optic network
Installation and connection of explosion proof light fixtures, devices and instruments
Installation of new 4000’ heat trace system |
| |
|
Cenex Harvest States Coker Ductbank
Excavation and installation of 2300' of concrete encased underground electrical ductbank, including 35,0000' of electrical conduit.
Installation of underground concrete electrical vaults
Installation of Trenwa underground electrical trench |
| |
|
ConocoPhillips Tanks Gauging, Phase V
Installation of field bus to 31 tanks
Installation of radar gauges on 9 tanks
Installation of 13,000' of rigid conduit
Pull and terminate 40,000' of cable
Work performed in "fresh air" gear on tank structures |
| |
|
ConocoPhillips FCC Project
Installation of new third and fourth stage separator
Installation of new classified lighting panels and fixtures on new structures
Installation of instrumentation system
|
| |
|
Cenex Harvest States Merox/Olefin Splitter
Installation of process control and monitoring instruments.
Installation of 6000' of rigid conduit
Installation and termination of 25,000' of wire and cable
|
| |
|
ExxonMobil Little Texas Construction Facility
Installation of 4000 ft of electrical duct bank
Installation of new 5kV transformer and related equipment
Installation of new communications network
Installation of grounding system
|
| |