Three Buttes Wind Farm Project - Casper WY
Installation of Qty 66 - 35 kV transformers and basements
Installation of turbine to transformer cabling
Installation of ground grid and grounding system
High voltage splicing and terminations
Wiring of Qty 66 - 1.5 MW GE turbines
Trenching and Installation of 21 miles of underground high voltage and fiber optic cables
|
| |
|
Silver Sage Wind Farm - Cheyenne, WY
Installation of Qty 20 - 35 kV transformers and basements
Installation of turbine to transformer cabling
Installation of ground grid and grounding system
High Voltage splicing and terminations
Fiber terminations
Wiring of Qty 20 - 2.1 MW Suzlon turbines
Trenching and Installation of 8 miles of underground high voltage and fiber optic cables
|
| |
|
Silver Sage Substation - Cheyenne, WY
Installation of concrete foundations
Installation of underground conduits
Installation of ground grid
Installation of risers, bus supports, and dead end steel
Installation of Qty 2 - 35 kV breakers
Installation of 115 kV breaker
Bus installation and jumpering
Control house installation
Control wiring
Testing and commissioning
|
| |
|
Sheridan Wyoming Veteran Administration Center - Sheridan, WY
Replacement of High Voltage System through the facility
Demolishing of existing HV system
Installation of new High Voltage Transformers
Switching of critical loads
Installation of 8000' of concrete encasted duct bank |
| |
|
Glacier Wind Farm Phase I & II - Ethridge, MT
Installation of Qty 140 - 35 kV transformers and basements
Installation of turbine to transformer cabling
Installation of ground grid and grounding system
High voltage splicing and terminations
Fiber terminations
Wiring of Qty 140 - 1.5 MW Acciona turbines |
| |
|
Overland Pass Pipeline Project - Southern WY/Northern CO
Installation of power, lighting, HVAC, communications,and instrumentation for six pipeline pump station monitoring sites
|
| |
|
ExxonMobil Flare Gas Management Project
|